Cesflo

Track every process, from first step to done.

Map your team's work as simple steps, give each step an owner, and see live where everything stands. Cesflo tells people when it's their turn and flags anything running late.

Steps run in the right orderLate work gets flaggedYour data stays private

TPL-FAC-04

Chiller Plant Maintenance

4/7 stages
Field Inspection Signed off
Technical Review In progress
Budget Authorization Waiting on AND-join

Built for teams that pass work along

FacilitiesHSE & SafetyProcurementHRMaintenanceOperations
How it works

How Cesflo keeps work moving

Four simple rules every process follows, so nothing gets stuck or forgotten.

Find delays

See which step slows you down.

Cesflo records how long every step really takes compared with its target. When the same step is late again and again, you see it straight away, so you can fix that step instead of chasing the same delay every month.

Time taken, for every processOn-time rate, week by week

Stage performance

Average actual time vs. target, across every completed run

Field Inspection1.9h avg
Technical Review3.9h avg
Budget Authorization1.5h avg

Technical Review is running 95% over target. That's where to look first.

Budget vs. actual

Chiller Plant Maintenance · Technical Review stage

Senior Technician · 3.5h @ $85/hr$310.25 of $297.50
Diagnostic rig rental$150.00 of $150.00
Replacement parts$468.00 of $420.00
Budget
$867.50
Actual
$928.25
Variance
+$60.75

Technical Review is running 7% over budget, replacement parts are the driver.

Track costs

Know what every process costs.

Add the people, equipment, materials and other expenses each step needs, and Cesflo works out the budget for you. As work happens, it records what was actually spent and shows you the difference, step by step. No spreadsheet needed.

Budget fixed when the job startsBudget vs. actual, for every step
Department view

See how each department is doing.

Pick a department and the whole dashboard shows just that team: how much work is active, what's on time, and what's falling behind. Managers and leaders get a clear answer without having to ask around.

Linked to your company goalsFilter everything by team

By department

All functions ▾

Facilities

5 active processes

92% on time

HSE & Safety

3 active processes

100% on time

Procurement

4 active processes

61% on time
Step one

Set it up once

Define the steps, who does them, and what proof is needed, just once. Every new job follows the same plan automatically.

TriggerManual or scheduled

New process run requested

ValidationAutomated check

Validate criteria & initialize SLA

Assign OwnerTarget SLAEvidence Required
Action

Field Inspection

Photo Proof Required

Action

Technical Review

Supervisor Sign-Off

Action

Budget Sign-off

Locked until Step 2

Try it

Try it: when does work count as late?

Move the sliders to see how Cesflo decides whether a step is on track, at risk, or late.

Current Health

Healthy

On track

Target SLA for this stage4h
Time elapsed so far3h
Hours sat blocked0h
Time used: 75% of target3h / 4h target
Getting started

Three steps to running work as a process.

No training needed. If a step needs to be redone, it goes straight back to the person who can fix it.

1

Build it

List the steps, choose who does each one, and say what proof is needed.

2

Start it

The first steps begin right away. Each person is notified when it's their turn.

3

Watch it move

Steps are marked done with proof. Anything late is flagged, so nobody has to chase.

See the full walkthrough

Field Inspection

Signed off

Technical Review

In progress

Safety Compliance

Signed off

Budget Authorization

Waiting on AND-join

Real work

Built for work that happens out there

On site, between teams, and on the phone in someone's pocket.

A technician signing off a stage on the shop floor

Field work, signed off on the spot

Whoever closes out the stage attaches the photo evidence right there, from their phone.

Facilities and maintenance leads reviewing a handoff together

The next owner finds out the second a stage lands

A push notification and an email, the moment it's their turn.

Close-up of a repair being documented

Every sign-off keeps its receipts

Photos and documents attach directly to it, permanently.

Late work gets noticed

2 hours

is when a stuck step reaches the manager, by default. You choose the time.

Budgets don't drift

Fixed

the budget is set when the job starts, so later price changes can't alter it.

Proof stays on file

Always

photos and documents stay attached to the step they belong to.

Your next process could be running today.

Build it once, and every job after that shows up on your dashboard automatically.

Signed out visitors are directed to login before accessing workspace tools.